In planning of the Tseung Kwan O Extension in 1997, a dedicated station serving the Tseung Kwan O Area 86 development has already been included in the development blueprint. When the new station in LOHAS Park is opened for passenger services in 2009, the Tseung Kwan O Line train service will bifurcate at Tseung Kwan O Station with trains running south to LOHAS Park adjacent to the existing Tseung Kwan O Depot, as well as north to the existing terminus at Po Lam.
The Project will comprise the following elements:
- Station and the Approach Structures;
- Building Services and the Architectural Builders Works and Finishes;
- Property Enabling Works including a temporary Public Transport Interchange;
- Road L861 and Wan Po Road improvement works (Entrustment from CEDD to be agreed);
- Trackwork and Overhead Line; and
- Various Systemwide E&M works
Following several rounds of amendment to the Master Layout Plan for the development, the scheme design and implementation programme for the station are now being firmed. Opening of the Station for revenue service is planned in 2009 in line with the property intake for Package One development of LOHAS Park which was awarded in January 2005.
Civil construction of station was commenced in June 2006 and electrical and mechanical systems will be installed from early 2008. Road L861 and the temporary public transport interchanges are scheduled to be completed and opened to public with Station in 2009.
|
Progress Update - September 2008 |
Station
Building Services works are progressing as planned. Building Services testing and commissioning are in progress.
Government Entrusted Works
Road formation, drainage and utility works are in progress. The fresh water main installation was completed for Road L861.
Overhead Line
All of the Overhead Line testing and commissioning were completed and energized in August 2008.
Electrical and Mechanical System and Architectural Builder's Works Finishes
Most of the architectural works were completed. For electrical and mechanical systems, testing and commissioning are in progress with all lifts and escalators completed.

Overview of
LOHAS Park Station
& Road L861 site |

Road works at Wan Po Road |

L861 Bridge A |

Customer Services Centre installation |

Building services installation at station platform |

Platform Supervisor Booth installation |
|