Project Description

As part of the North South corridor, the Shatin to Central Link – Mong Kok East to Hung Hom section [SCL (MKK-HUH)] involves the 1.2km realignment works for the existing East Rail Line (EAL) tracks from the tunnel portal near Oi Man Estate (Portal 1A) to Hung Hom Station (HUH).

The SCL (MKK-HUH) tunnel structure is proposed to be mainly constructed using the cut-and-cover method. For the section entering the new Hung Hom Station deck, some supporting pilling would be built under the podium deck before construction of the tunnel. Apart from the tunnel construction works, other associated construction works include the construction of ventilation shafts, cooling tower, modification work to Hung Hom Station podium structures and some supporting works.