Target
|
Status
|
Explanation
|
|
FINANCE
|
|
Logistic & Material Management
- Electronic Requisition System - Design an electronic requisition
system for new stock items to replace the existing paper requisition.
|
50%
|
Feasibility study identified technical
constraints to be considered in design.
|
|
PROPERTY
DEVELOPMENT
|
|
External
Education & Training - Establish formal records of environmental
training.
|
0%
|
Records to
be established in 2003.
|
|
External
Education & Training - In line with the Dream City Concept developed
by the Corporation, develop program design packages for tendering.
|
75%
|
Development
awaiting Government approval.
|
|
Property
Construction - Encourage contractors to use off site pre-fabricated
modular construction.
|
75%
|
Off-site
methods to be adopted for new sites.
|
|
Regulatory
Compliance - Design the Kowloon Station Development Packages 5,
6 & 7 to achieve at least Level 2 Indoor Air Quality.
|
75%
|
Design in
progress.
|
|
Audits and
Reporting - Complete the HKBEAM assessments on 3 new property developments
(ie HK Station Mega Tower, Olympic Station Package 3 Residential
Development, Kowloon Station Package 3 Residential Development)
and, as applicable, commence/undertake assessments for new property
developments.
|
75%
|
HKBEAM assessments
are ongoing.
|
|
Environmental
Management System (EMS) - Comply/implement the requirements of the
Corporate EMS as applicable.
|
75%
|
EMS has been
implemented as applicable.
|
|
Property
Construction - Encourage contractors to use dry wall construction.
|
75%
|
Dry wall
techniques to be used at new sites.
|
|
Property
Design - Adopt Electronic Ballasts in the new office building of
Kowloon Station Development Package 5, 6 & 7.
|
50%
|
Electronic
Ballasts have been adopted in Package 7.
|
|
Property
Design - Adopt Variable Air Volume (VAV) Air Conditioning in the
new office building of Kowloon Station Development Package 5, 6
& 7.
|
50%
|
VAV Air Conditioning
has been adopted in Package 7
|
|
Property
Design - Adopt Variable Speed Pumping System (VSPS) in the design
of the new shopping centre in Kowloon Station Development for potable
water supply system, and in the new office building in Kowloon Station
Development Package 5, 6 & 7 for the air-conditioning system.
|
50%
|
VSPS has
been adopted in retail center in Package 5 and in the air conditioning
system of the office tower in Package 7.
|
|
Property
Construction - As appropriate, encourage the adoption of metal formwork
instead of timber formwork for building construction in new development
sites.
|
75%
|
Metal formwork
will be adopted on new sites.
|
|
Property
Construction - Encourage the use of tropical hardwood from managed
sources only.
|
75%
|
Hardwood
from managed sources is being used for new LAR & TKO developments.
|
|
HUMAN RESOURCES
|
|
Develop and
implement Environmental Management System and support development
of corporate EMS.
|
50%
|
Human Resources
is integrated into the ISO14001-certified EMS to the extent currently
necessary.
|
|
Disseminate
information on new environmental protection issues.
|
75%
|
Greater information
sharing was anticipated.
|
|
PROPERTY
MANAGEMENT
|
|
Internally
benchmark waste generation of MTR managed properties and develop
quantitative targets and action plan for 2003.
|
25%
|
Data collection
in progress. Quantitative targets will be prepared in first quarter 2003.
|
|
Work with
Legal and Procurement on the implementation of the 'Green Procurement'
policy.
|
0%
|
Postponed
to 2003 / 2004.
|
|
Internally
benchmark energy and water consumption of MTR managed properties
and develop quantitative targets and action plan for 2003.
|
25%
|
Data collection
in progress. Quantitative targets will be prepared in first quarter 2003.
|