|
Wastewater is generated from both construction and operational activities
and MTR has introduced practical measures to reduce and improve discharge
quantity and quality. During 2002, a further 3 treatment plants and 11
external pipeline diversions were installed. These and other initiatives
enabled MTR to be 98.8% compliant with the Water Pollution Control Ordinance
during 2001:
¡P 96% for the Tsuen Wan Line
¡P 99% for the Island Line
¡P 100% for the Kwun Tong Line
¡P 100% for the Lantau Airport Railway
|