OPERATIONS ¡V Waste |
|||||||||||||||||||||||||||||||||||||||||||
2001 Achievements
|
|||||||||||||||||||||||||||||||||||||||||||
|
¡P
Maintained
or better the level of wheel turning activity in 2000 ¡P
Maintained
or better the level of rail grinding activity achieved in 2000 (90% complete) ¡P
Awarded
contract for new higher capacity rail grinding train ¡P
Removed 50%
of the redundant rail joints at the open section from Choi Hung (CHH) to Lam
Tin (LAT) ¡P
Maintained
flange lubricators fitted to Lantau Airport Railway (LAR) trains ¡P
Maintained
the rail lubricators fitted to 6 units on 3 Urban Lines (URL) ¡P
Completed
installation of an acoustic barrier system in the fixed high platform OHL
wagon ¡P
Continued to
monitor noise from the LAR ¡P
Tested under
floor noise monitoring system (75% complete) ¡P
Continued to
monitor noise at 27 sensitive receivers adjacent to the open sections of MTR
lines ¡P
Completed
the rolling stock noise study for the Kwun Tong Line (KTL) and examine
measures for reducing noise ¡P
Continued to
undertake the retrofitting exercise for public address systems and conduct
acoustic test at North Point Station ¡P
Conducted
indoor air qualities surveys at 3 transport interchanges and achieve 100%
compliance with the design standards ¡P
Continued to
monitor indoor air quality at 40 URL and LAR stations ¡P
Conducted
radon surveys for Tsuen Wan Line (TWL) and achieve 100% compliance with the
WHO limits (99% complete) ¡P
Rolled out
the passenger waste paper recycling activity from 4 trial stations to others ¡P
Extended
waste recycling activity to cover metallic and plastic wastes ¡P
Recycled all
waste metal ¡P
Awarded
oil-recycling Contract and achieve 100% recycling of waste oil ¡P
Adopted acid
detergent which contains no volatile organic compound and no COD or BOD at
one URL train-wash ¡P
Completed
modification works at Kowloon Bay Depot. ¡P
Maintained a
quarterly wastewater-monitoring program to monitor discharges from stations,
tunnels and depots ¡P
Installed
wastewater treatment systems and undertake external pipeline diversions to
achieve 100% compliance with WPCO (99% complete) ¡P
Conducted
asbestos removal work in 14 URL stations |
|||||||||||||||||||||||||||||||||||||||||||
2002 Targets
|
|||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||
|
Next Division
|
|
|||||||||||||||||||||||||||||||||||||||||
|
Previous Objective
|
Next Objective
|
|
||||||||||||||||||||||||||||||||||||||||