|
Optimise Overall Thermal Transfer Value
(OTTV) for Kowloon Station Development Packages 5, 6 & 7.
Adopt Electronic Ballasts in the new office
building of Kowloon Station Development Package 5,6 & 7.
Adopt Variable Air Volume (VAV) Air
Conditioning in the new office building of Kowloon Station Development
Package 5,6 & 7.
Adopt Seawater Cooling in Kowloon
Station Development Package 5,6 & 7.
Adopt Energy Saving Light Fittings in
the design of the new shopping centre in Kowloon Station Development and
the park-and-ride carpark in Choi Hung Station Development.
Adopt Variable Speed Pumping System in
the design of the new shopping centre in Kowloon Station Development for
potable water supply system, and in the new office building in Kowloon
Station Development Package 5,6 &7 for the air-conditioning system.
|