Skip to Content

搜尋結果

부천출장마사지구미출장샵【카카오:po03】 的查詢結果:第 11 - 20 個 ,共 87 個。

搜尋

MTR Map - 港铁
MTR Map - 港铁
https://www.mtr.com.hk/alert/map_all.html - 2024-05-09
MTR > System Map - 港铁
Location maps showing leading hotels, shopping centres and major buildings and their nearest station exit are strategically positioned in high-profile locations on most station concourses. Station layouts are also available. Kwun Tong Line. Location Map. Station Layout.
https://www.mtr.com.hk/en/customer/services/system_map.html - 2024-05-10
MTR > Island Line - 港铁
MTR/AP/55 Causeway Bay Station and Tunnels. MTR/AP/56 Tin Hau Station and Tunnels. MTR/AP/57 Fortress Hill Station and Tunnels. MTR/AP/58 North Point Station and Tunnels. MTR/AP/59 Quarry Bay Station and Tunnels. MTR/AP/60 Tai Koo Station and Tunnels. MTR/AP/61 Sai Wan Ho Station and Tunnels. MTR/AP/62 Shau Kei Wan Station and Tunnels.
https://www.mtr.com.hk/en/corporate/operations/route_island_url.html - 2024-05-11
MTR > Railway Protection - 港铁
Limiting Figures. Pressure change on any underground structure / installation (P) - 20 kPa ≤ P ≤ 20 kPa. Movement. ≤ 20 mm for a total movement in any railway structures / installations. ≤ 1 in 1000 for distortion in any railway structures / installations. ≤ 5mm for the induced level difference between rails of a track in ...
https://www.mtr.com.hk/en/corporate/operations/protection_criteria.html - 2024-05-09
MTR > MTR Train Services - 港铁
Station opening hours: 05:58-01:17. To First Train Last Train-0608: 0047-0617: 0106: Passenger may not pass through the entry gates less than 5 minutes before the scheduled departure times of the last train. To First Train Last Train-0608: 0046-0618: 0047-0618: 0107:
https://www.mtr.com.hk/en/customer/services/service_hours_search.php?query_type=search&station=16 - 2024-04-08
MTR > Investor's Information > Corporate Governance - 港铁
Corporate Governance. Please refer to our Corporate Governance Report contained in the Annual Report 2023 for details of our Corporate Governance performance. Biographies of the Members of the Board. Dr Auyeung joined the Board as a Non-executive Director on 7 March 2019 and has become the Non-executive Chairman since 1 July 2019.
https://www.mtr.com.hk/en/corporate/investor/governance.html - 2024-05-09
MTR > Kwun Tong Line - 港铁
MTR/AP/21 Kwun Tong Station and Overhead Viaduct. MTR/AP/22 Lam Tin Station and Overhead Viaduct. MTR/AP/23 Lam Tin Station and Overhead Viaduct. MTR/AP/24 Immersed Tube Tunnels to Lam Tin Tunnels. MTR/AP/204 Yau Tong Station and Tunnels. MTR/AP/205 Yau Tong Ventilation Building and Tunnels. MTR/AP/206 Black Hill Tunnels.
https://www.mtr.com.hk/en/corporate/operations/route_ktl.html - 2024-05-08
MTR > Tseung Kwan O - 港铁
MTR/AP/209 Tunnels between Tiu Keng Leng Station and Tseung Kwan O Station. MTR/AP/210 Tseung Kwan O Station. MTR/AP/211 Traction Infeed Sub-Station. MTR/AP/212 Pak Shing Kok Ventilation Building. MTR/AP/213 Hang Hau Station. MTR/AP/214 Tunnels between Po Lam Station and Hang Hau Station. MTR/AP/215 Po Lam Station.
https://www.mtr.com.hk/en/corporate/operations/route_tko.html - 2024-05-09
MTR > MTR Railway Network - 港铁
The MTR has been providing a safe, reliable and efficient way to get around Hong Kong since 1979. In December 2007, the operations of MTR and Kowloon-Canton Railway Corporation have been merged to form one of the most efficient and far-reaching railway networks in Asia. The newly expanded system extends all the way from the heart of Central and ...
https://www.mtr.com.hk/en/customer/services/our_network_introduction.html - 2024-05-11
MTR > MTR Shops Finder - 港铁
Tai Wai. Passenger Services. QB House. TAW 1. B. Automatic Teller Machine,Courier Service,MTR ATM Service,MTR station Maxim's Cakes,Automatic Photo Machine,MTR Facilities For Passengers With Disabilities,Facilities for Visually Impaired Passengers,Facilities for Hearing Impaired Passengers,Facilities for Mobility Impaired Passengers,Photo ...
https://www.mtr.com.hk/en/customer/shops/shop_search.php?query_type=search&start=67 - 2024-05-04
搜尋